• Search
  • Category
  • Region
  • Parish
  • School Type
  • School
  •  
School School Type Region Parish Category Need
Arcadia Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Fencing Perimeter fence to ensure safety/security of students.
Arcadia Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure A. re-sheeting of roof, replacement of ceiling and rotting purlins; B. Replacement of partition wall and cladding; C. Refurbishing of canteen;.
Arcadia Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure Installation of plastic water storage tank 3000gallon.
Arcadia Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Pest/termite Control Termite Treatment.
Barking Lodge Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure General Repairs to Teacher's Cottage.
Bath Primary & Junior High 1.5 Primary & Junior High 2. Port Antonio 3. St. Thomas Infrastructure Replacement of roof sheeting and defective members.
Bath Primary & Junior High 1.5 Primary & Junior High 2. Port Antonio 3. St. Thomas Infrastructure Electrical repairs to the school buildings.
Bethesda Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure A. Completion of unfinished section of school building; and B. Construction of Box-Drain.
Bull Bay All Age 1.3 All Age 2. Port Antonio 3. St. Thomas Infrastructure A. Replacement of roof sheeting and defective members; and B. construction of storm water drain Perimeter Fencing.
Duckenfield Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure Construction of a library.
Hillside Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure A. Construction of Retaining wall behind Block B & C; B. Covering of open drains; and C. Replacement of defective doors & Windows.
Middleton Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure Construction of new canteen.
Minto Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure Construction of retaining Wall.
Penlyne Castle Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure General repairs to timber building..
Robert Lightbourne High 2.3 Secondary High 2. Port Antonio 3. St. Thomas Infrastructure A. Waterproofing of Administrative Block; and B. Repairs to staircase.
Seaforth High 2.3 Secondary High 2. Port Antonio 3. St. Thomas Infrastructure Upgrading of the electrical system.
Seaforth Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Infrastructure Replacement of roof sheeting and defective windows.
Spring Garden Primary 1.1 Primary 2. Port Antonio 3. St. Thomas Books Books.
12